
Sensor with ribbed mounting bracket
Scope a prototype mold for a ribbed mounting bracket by checking hole locations, mounting flatness and the resin before the first trial.
Agree on drawing revision, resin, dimensions, assembled fit and appearance. Keep any unresolved question visible before releasing the next run.

Decide which checks are for the molded part, which need the mating assembly and which depend on an approved appearance sample.

Scope a prototype mold for a ribbed mounting bracket by checking hole locations, mounting flatness and the resin before the first trial.

Prepare a pilot-to-production handoff around the enclosure, gasket interface, hardware revision and agreed inspection points.
These review points are for new projects.
Latest CAD and drawing with marked fit and appearance zones
View review checklist →Drawing revision, resin grade and intended surface
View review checklist →Approved revision, resin, finish reference and signed-off samples
View review checklist →Latest CAD revision and mating-part drawings
View review checklist →Resin grade and target color or physical reference
View review checklist →Base CAD and variant CAD with the changing feature marked
View review checklist →Include the revision, use conditions and estimated quantity.
Agree on materials, interfaces and tooling responsibilities.
Review appearance, assembly and agreed inspection points.
Agree on the accepted revision, checks and production plan.
State the part revision, target resin, expected sample quantity and which features the first shot needs to prove.