Rapid tooling · Trial parts · Production handoff[email protected]+86 176 2030 0785
PROTOTYPE TOOLING
Project enquiries+86 176 2030 0785

AI application illustration

Tooling handoff for a gasketed enclosure

Prepare a pilot-to-production handoff around the enclosure, gasket interface, hardware revision and agreed inspection points.

Gasketed field controller
AI application illustration
Gasketed field controller close-up
Close-up of the finished-product concept

Capture the accepted assembly stack

List which enclosure, cover, gasket and fastener revisions made up the accepted sample. Photograph or mark orientation and define any dimensions that must be checked after assembly.

Agree on the production evidence

Separate dimensional acceptance, appearance and any seal test in the release record. If a sealing claim is required, define the assembled test conditions and responsible test party in advance.

Technical reference · Protolabs procurement and inspection guide

Prepare your quote request

  • Signed sample and assembly revision list
  • Gasket cross section and mating geometry
  • Inspection and any validation plan
Get a Quote ↗

Buyer questions

Does this concept carry an ingress rating?

Determine any rating from the defined, assembled product and its applicable test.

Should the gasket sample travel with the tool handoff?

If it controls fit or test results, include an identified example or agreed specification.

Handoff from prototype mold to production →

Ask about your project ↗