Rapid tooling · Trial parts · Production handoff[email protected]+86 176 2030 0785
PROTOTYPE TOOLING
Project enquiries+86 176 2030 0785

AI application illustration

First-shot enclosure and lid fit sample

Plan the first molded enclosure check around lid seating, screw-boss alignment and the joint gap with the actual mating cover.

Monitor with separate cover
AI application illustration
Monitor with separate cover close-up
Close-up of the finished-product concept

Check the complete joint

Define which surfaces seat first and where to measure any gap or step. Compare the lid both loose and fastened using the specified screws or clip configuration.

Record the exact mating revision

A lid from a different revision can mask where the change came from. Record the shell and lid revisions, assembly order and any interference before deciding on a tool correction.

Technical reference · Protolabs prototype tooling options

Prepare your quote request

  • Current shell and lid drawings
  • Fastener or latch details
  • Gap and flushness checking locations
Get a Quote ↗

Buyer questions

Should the shell be checked before fastening?

A loose fit and the specified fastened assembly can reveal different issues. Agree on both states if they affect the decision.

Where should dimensions be recorded?

Define datums and measurement locations on the drawing for consistent repeat checks.

First molded parts for engineering review →

Ask about your project ↗