All buyer guides · · OPINOX
Use the connector cross-section to see whether the hole can be formed by drafted steel faces that separate along the main opening direction. If the opening traps a straight-pull core and the mating geometry must remain unchanged, ask the mold maker to assess a side action. Approve either option with the real connector and its mating hardware.
In this guide
- Determine which opening features are fixed
- Compare the slide and shut-off proposals
- Draw the complete installation envelope before choosing the mold
- Know what to ask about each construction option
- Use an example to decide what can move and what cannot
- Record the dimensions, fit and surface criteria together
- Test the opening with the real assembly
- RFQ questions and answers
Determine which opening features are fixed
Mark the connector body, panel edge and plug insertion direction on an assembly section. Specify the minimum free opening, datum locations, panel thickness and visible edges that matter. For a connector with a flange or seal, show the mating surface and identify where changes to draft or a split line would affect it.
A fully surrounded side hole can be an undercut for a given tooling orientation. Some side openings can instead be formed where the cavity and core meet with drafted shut-off faces. Compare actual section geometry with the proposed mold opening direction instead of assuming every side hole requires a slide.
Compare the slide and shut-off proposals
Protolabs describes a side action as moving the tool feature out of an undercut before the part ejects. Ask the tooling team to show the motion direction, space needed and where the tool interface may leave a visible line. Confirm that the proposal maintains the mounting surfaces and connector clearances.
A drafted shut-off uses mating tool faces to stop plastic from filling a section. Ask how the proposed draft changes the usable opening and which edges carry a flash risk if the tool faces wear. Request a section drawing of each option with an estimated tooling and sampling scope.
- Latest assembly section with connector drawing and required engaging surfaces.
- A map of alignment datums, usable opening limits and fit checks.
- Vendor drawing showing proposed pull direction and slide or shut-off interfaces.
- Agreed surface and flash criteria plus a plug insertion or seating check on samples.
Draw the complete installation envelope before choosing the mold
Draw the opening with the actual connector installed, then add the plug approach and any service clearance needed to release its latch. If the connector is mounted to a PCB rather than fixed directly to the housing, include the stack between the PCB mounting bosses and the outside wall. The opening has to work across that assembly variation. The difference between the largest visible edge and the smallest internal opening matters more than a nominal rectangle from the outside view.
Separate the edges that center the connector from edges that only need to clear a plug or wire. Mark where the connector shoulder or bezel sits and what surface holds a gasket when one is required. Ask whether the geometry could accept an opening to a part edge or a split across a housing seam. If the enclosure has a cosmetic trim piece, draw it so the toolmaker can see which lines will be covered.
Review connector access in product use. A bulkhead fitting may need clearance for a wrench or retaining nut. A latching plug can need finger access while the cable bends. Document the approach that the buyer expects on the finished product, rather than asking the supplier to check only whether an isolated connector passes through a hole.
Know what to ask about each construction option
For a side-action proposal, ask for a sketch of the travel and how the feature clears before ejection. Have the supplier show where tool faces come together, how the opening and adjacent wall are supported and which surfaces may carry witness marks. Discuss how changing the position of the hole later might affect the slide or its insert. A quote for the moving feature should specify what it forms and which related operations are included.
For a drafted shut-off, ask for sections at the opening's closest and widest points. The required draft may change the shape through the wall. Confirm that the resulting minimum opening still clears the connector, and review whether the slope affects a face that positions or seals it. If the proposal depends on moving the seam or removing part of a web, make sure that change is compatible with the product drawing.
Protolabs' tooling examples show that shut-off faces depend on how they pass one another and meet when the mold closes. The suggestion may make one version simpler to tool, but a workable result depends on your mold construction, part geometry and acceptance requirements. Have the supplier define those assumptions for the specific quote.
Use an example to decide what can move and what cannot
Consider an instrument enclosure with a rectangular data-port opening in its side. The insert can be pushed through easily, but the plug body is wider than its metal end. The first CAD review measures only the obvious metal tip. During a fit check, the housing edge interferes with the plug body before the latch engages. Mark the maximum envelope of the plug and check that its path remains clear at the chosen opening depth.
If the port has an independent trim bezel that covers the seam, the team might have room to move the seam or adjust the visible opening. If the connector flange must seal against a continuous face, changing the opening to an edge or putting a witness line on that sealing face may be unacceptable. Show these two conditions on the drawing so the mold proposal answers the actual problem.
Run the comparison through a second plausible assembly scenario when the design has more than one connector option. If both are intended for the same housing, compare their port position, latch access, screw or nut clearance and cable approach. Agree whether the pilot tool must support both variants or only the configuration being tested first.
Record the dimensions, fit and surface criteria together
Inspect the molded opening against the agreed datums. Measure across the area that controls function, not simply the largest opening from the outside. Use the specified mounting and plug insertion procedure for a fit check. If there is a sealing face, include its separate inspection criteria. Keep the actual drawing and the standard sample together for later review.
Check for flash at the edges where mold faces meet. Fine flash at a hidden edge can affect mating even if the housing looks acceptable. Flash at a cosmetic edge can matter independently of connector function. A photo or reference set can make the agreed limit clearer. If trimming is allowed in the pilot scope, record it so the approved sample remains traceable to the manufacturing method.
After approving one version, document the connector part number, drawings, control dimensions, fixture or assembly method, and agreed surface limits. A replacement connector or an altered wall section can change the fit even when the port is marketed under the same general name. Review changes to the hole and hardware together.
Test the opening with the real assembly
Check the minimum effective opening at the relevant depth, especially when a drafted edge tapers inward. Fit the actual connector and plug with the intended hardware. If a temporary machined opening was used for an early prototype, label that sample accordingly. Verify the molded opening separately before signing off on tooling.
Buyer questions
Does an enclosed side opening always require a slide?
No. The tool opening direction, accessible profiles and required geometry determine the choices. Ask for a cross-section showing whether the tool faces can meet and separate without trapping the part.
How much flash can I accept at the opening?
Set the limit from fit, visibility and the connector supplier's mating requirements. Identify the specific edges on the drawing and agree on how they will be inspected.
RFQ questions and answers
What should I provide to get both mold options quoted?
Send the current part CAD, a dimensioned connector drawing and the assembled cross-section with the plug envelope. Mark visible edges, minimum access, sealing areas and surfaces that cannot move. State which design changes the supplier can consider during the review.
How do I compare the options on cost and scope?
Ask for tool scope and sample scope for each proposal, including any moving insert, hand operation, trimming or separate inspection. Ask the supplier to show differences in allowable opening geometry, responsibility for design changes and the effect a later port revision would have.
What inspection items should the trial quote include?
Request checks of the critical opening dimensions, edge condition and fit with the actual connector and plug. Include a sealing-face or latch-access check when it applies. Specify whether you will supply the mating hardware and the acceptance sample or photos.
Can a machined opening be used before starting the mold?
It can support an early access check if the prototype is labeled as machined. Build a separate acceptance step for the molded opening. Its draft, contact lines, surface and fit conditions may differ from those of the manually finished sample.
What if one enclosure needs two different port openings?
List the two complete assembled interfaces and the quantities for each. Ask whether the quote assumes one fixed mold layout, a construction allowing a change of local insert, or separate tooling. Request distinct sample IDs so each interface is approved on its own.
Related products and services
Discuss this project with OPINOX →

